I have just completed gas flowing the head and rebored the cylinder.
I Had to travel all the way to Bombay to get the job done properly. I have replaced the valve guides with phospher bronze guides, the new inlet valve has a larger head than the stock and the valves are nitriled.
We have also cut the seat to unshroud the valve(three angle valve job).
Monster Dog should should be ready to fire up by the end of this week!
1948 supercharged vincent black lightning at the Bonneville salt flats.

Roland "Rollie" Free at 150mph on his record breaking run.
161.8kmph(100mph)!!
Monster dog parked on the highway on test run no 1
taking a break


removing the cover
Drag bike??
engine complete!
Khardung la one of the world's highest motorable passes.
Subscribe to:
Post Comments (Atom)
Alluminium block.
Block being bored out to size.
Alluminium block.
The final honing process.
the finished right shift gearbox
Right shift conversion
the standard 5 speed
No comments:
Post a Comment