Wow!Progress is good.The dummy engine and gearbox in the frame have been replaced with the 5 speed gear box and rebuilt crankcase.The rear sets and gear shift have been fabricated and i must say the gearshift is silky smooth.
I am still working on the upper end of the engine,that should be complete in a week or two.
I will start working on fabricating the fuel tank soon.
Ol'Murphy has'nt paid us a visit as yet...?
1948 supercharged vincent black lightning at the Bonneville salt flats.

Roland "Rollie" Free at 150mph on his record breaking run.
161.8kmph(100mph)!!
Monster dog parked on the highway on test run no 1
taking a break


removing the cover
Drag bike??
engine complete!
Khardung la one of the world's highest motorable passes.
Saturday, December 6, 2008
Subscribe to:
Posts (Atom)
Alluminium block.
Block being bored out to size.
Alluminium block.
The final honing process.
the finished right shift gearbox
Right shift conversion
the standard 5 speed